top of page

About Us

High Peak Access Ltd is an industrial rope access and geotechnical company based in the Peak District, Derbyshire.
We offer access solutions for our clients, and specialise in services to the quarrying industry and heritage site services.
We work with clients right across the UK, including: Tarmac, Arena, Showblock, The National Stone Centre, Heidelberg Materials, Local Authorities, RSPB, Astra-Zeneca, Breedon, Omya, IKO Plc and more.

About Us

High Peak Access
Tarmac
The QMJ Group
National Stone Centre
Buxton Lime Limited

Based in the Peak District, Derbyshire, we work with clients across the East Midlands and wider UK to provide a safe system of working at height using ropes and equipment to gain access and provide time efficient and cost effective solutions for our clients.

​

Our specialist team are highly skilled, competent and undertake regular CPD and specialist training to provide a high quality and safe standard of work. All of our rope access technicians are qualified IRATA and confined space trained, capable of working in a wide range of environments. 

 

Our team's expertise lend themselves proficiently to the quarrying industry and heritage sites, supporting geotechnical works and vegetation removal, quarry maintenance and silo cleaning, rock face netting, inspection & surveys, stabilisation works, conveyor maintenance, industrial cleaning, Non Destructive Testing (NDT) and much more.

Contact us to find out more.

​​

​

​

The Royal Society for the Protection of Birds (RSPB)
logo-peakDistrict-new.png
Breedon Group

Some of our clients:

Hillhead
Heidelberg Materials
Iko.
The Institute of Quarrying
Arena
AstraZeneca
Showblock
Omya

Client feedback

Cement Silo

"Emptying a 6000t Tarmac cement silo for the first time in 20 years was certainly never billed as an easy task, however hiring the right skill sets for the job can make it as simple as possible.
Having High Peak Access Ltd on board was the first and smartest choice made.
They provided the Rope Access into the silo from the top, scaling the walls and clearing build up.
Alongside that they were the rescue element into the numerous confined spaces and if that wasn't enough, they then dropped onto the silo base, breaking up the larger lumps once the walls were done to enable a faster finish. Above and beyond service.
Anyone thinking about undertaking any similar task to this would be wise to contact High Peak Access."

bottom of page